Avnet Abacus lead-time guide

Long Copy

All information is correct as of April 2021

Connectors

      
Product Lead-time: weeks Lead-time: prognosis
Cable flat 10
Backplanes DIN 41612; 2MM; high speed; power signal; 14
I/O connectors 16
Memory card reader 13
Sockets DIP/SIP; PLCC/PGA/BGA; SIMM/IMM/Holtite 14
Non-solderable terminals/fastons 7
Circular military 18 =
Circular industrial 14
Circular medical 14
Rectangular military 16 =
Rectangular industrial 12
Rectangular medical 12
RF coaxial 14 =
Board to board 17
Wire to board/wire to wire 17
Automotive 18
Power - connector systems 15

 

Electromechanical

      
Product Lead-time: weeks Lead-time: prognosis
Switches 10 - 28
Relays general purpose 20 - 60
Relays automotive/telecom 20 - 40
Fans 8 - 21
Heatsinks 8 - 10
Sensors 10 - 26

 

Passive

      
Product Lead-time: weeks Lead-time: prognosis
Ceramic capacitors single layer 6 - 20 =
Ceramic capacitors leaded multilayer 6 - 20 =
Ceramic capacitors multilayer SMD  12 - 30
Ceramic capacitors multilayer high CV 16 - 52+
Ceramic capacitors safety caps 16 - 24 =
Ceramic capacitors trimmer cap 16 - 20 =
Ceramic capacitors automotive 16 - 52+
Aluminium electrolytic capacitors leaded 20 - 40
Aluminium electrolytic capacitors SMD 20 - 40
Aluminium electrolytic capacitors snap-in & large can 12 - 40
Film capacitors leaded   6 - 24+
Film capacitors SMD  10 - 22+
Film capacitors suppression   6 - 22+ =
Polymer capacitors 20 - 52+
Tantalum capacitors leaded 8 - 26
Tantalum capacitors SMD 20 - 52+
Resistive melf/resistive metal film 8 - 16 =
Resistive networks/arrays 14 - 20 =
Resistive precision pots and encoders  8 - 30 =
Resistive SMD 20 - 35
Resistive trimmer pots 8 - 20 =
Resistive wire wound  8 - 36 =
Circuit protection - fuses 6 - 25 =
Circuit protection - resettable devices 10 - 15 =
Circuit protection - thermistors 8 - 20  =
Circuit protection - varistors 8 - 20+
Antennas 8 - 14 =
Frequency control crystals/oscillators 8 - 30+ =
Frequency control resonators 8 - 14 =
Electromagnetic piezo buzzers, sounders and transducers 8 - 14 =

 

Power

      
Product Lead-time: weeks Lead-time: prognosis
AC-DC PSU general purpose 4 - 24 =
AC-DC PSU medical 4 - 24 =
AC-DC PSU DIN rail 4 - 24 =
Rectifiers & front-end PSU 10 - 24 =
AC-DC external adaptors 4 - 24 =
AC-DC railway 5 - 24 =
AC-DC LED drivers general 4 - 24 =
AC-DC LED drivers special 4 - 24 =
DC-DC miniature 8 - 24 =
DC-DC industrial & bricks 4 - 24 =
DC-DC panel mount 8 - 24 =
DC-DC LED drivers 4 - 24 =

 

Filters and magnetics

      
Product Lead-time: weeks Lead-time: prognosis
Active filter 10 =
EMI filter 10 =
Power line filter 10 =
SAW filter 10 =
Ceramic filter 10 =
EMI/RFI filter 10 =
RF filter 10 =
Common mode chokes 10 - 30
Ferrite chip beads 10 - 12 =
Ferrite core 10 - 22+ =
Inductor leaded 10 - 14+ =
Wireless charging coils 16 - 18 =
Inductor surface mount 8 - 80

 

Comments

Overall tightening market conditions due to stronger demand and logistics challenges from Asia, have resulted in significant lead-time increases which are accelerating fast. Heavily affected product areas are Tantalum, Polymer and electrolytic capacitors with lead times reaching up to one year by now. Supply on SMD resistors and MLCC is also tightening quickly.

Frequency control crystals/oscillators

Several MFRs are affected by a fire in the AKM factory (IC supplier) which results in much longer lead times and/or even obsolescence. Recovery plans have not been clarified yet. Possible ultimate impact to be confirmed.

Ceramic capacitors multilayer

Indicators suggest lead times on some specialty MLCCs may well increase towards the end of 2020 and into 2021. If you need to consider alternatives, read our article on polymer capacitors as a replacement for MLCCs

Inductors

Specific series, power and automotive are under capacity constraint. Overall we see extending lead times especially for automotive spec.

Relays & connectors

Very selective situation on our suppliers. Some parts are under capacity constraint affecting a few specific part series, especially for automotive. 

Coronavirus update

As the COVID-19 pandemic continues to affect the global landscape, there remain in effect many country governmental travel restrictions and border delays. Whilst Avnet Abacus and our supplier partners continue to work tirelessly to mitigate many challenges, we anticipate these restrictions may affect the supply chain and impact lead-times. Read the latest supplier update here.

Lead-time guide download

Lead-time guide

Download a PDF version of the lead-time guide

Download

Right Rail Card Dark_2

Newsletters

Sign up to get the latest supplier lead-times straight to your inbox

Subscribe

Right Rail Card Dark_1

Ask an expert

Have a question? Our field applications engineers are on hand to help

Get in touch

Static HTML

 

 

Polymer vs MLCCs article Grid Box Dark

Technologies

Replacing MLCCs with polymer capacitors

Polymer capacitors are a viable alternative to MLCCs in a number of applications. Learn how some of their key characteristics compare and whether they could be suitable for your design.

An assortment of polymer capacitors

Grid Box Dark

Technologies

Tackling recurring MLCC shortages

Fluctuating global MLCC demand is creating extremely challenging market conditions for the electronics industry. We can guide you through your options.

MLCCs on a PCB